Holiday Inn – Stannington, Morpeth

Capital Cost: £180,000

Simple payback: 1.8 years

Order to commission: 5 months

CO2 Savings per annum: 429,741 kgs Approximate until unit has been running 1 full year.

Type of Fuel: Mains Gas

Service Intervals: Every 1800 hours

Automatic Modulation: 50-100%

Dimensions: L3.5m, W1.65m, H2.2m

CHP Indop 140M Unit

The owner of the Holiday Inn at Stannington came to HQBS Energy Solutions via a recommendation from an industry professional.  They were looking to reduce their carbon footprint, whilst reducing their energy costs.

The CHP needed to be integrated into an existing, aging, inefficient heating system to produce hot water for the entire hotel, as well as its spa, which includes the high energy usage facilities of a jacuzzi and large swimming pool.

After a full site survey and consultation with the owners, we agreed the Indop 140 best suited their needs. This unit will produce 99% of the building’s electrical requirements and will offer simple payback within 1.8 years.

‘We take a great amount of pride in being able to offer a bespoke and personalised service that continues from the first enquiry, right through to completion and beyond.  We’re always willing to go that extra mile to ensure our customers receive the level of customer service that will keep them coming back to us’.